Minn. Stat. § 216B.2425 requires utilities that own or operate electric transmission facilities in the state to report by November 1 of each odd numbered year on the status of the transmission system, including identifying possible solutions to anticipated inadequacies in the transmission system.
Minn. Stat. § 216B.2425, subd. 2(e) requires a utility operating under a multiyear rate plan to file an Integrated Distribution Plan in addition to that required in the Biennial Transmission Projects Report (PDF).
2025 Integrated Distribution Plan (IDP) (PDF)
Attachment L-Financial Tabular Data (XLSX)
2025 Transportation Electrification Plan (TEP) (PDF)
TEP Attachment I-EVAAH Pricing Update Calculations (XLSX)
For more information contact:
Jody Londo
Director, Regulatory and Strategic Analysis
Have your home checked for leaky ducts, drafts around doors and windows, fireplace dampers, and other places where air might escape.
Always call 811 before digging in your yard to avoid hitting buried gas or electric lines. Not only is it the safe thing to do, but it's the law.
© 2021 Xcel Energy Inc. All rights reserved.
You have been selected to participate in a brief survey to help us improve our site.
By selecting YES, an additional window will open to allow you to take the survey at the conclusion of your visit. Please do not close it if you would like to participate.