Net Metering & Interconnection Developer Resources

Process for Requesting Interconnection and Net Metering

Customers may install rooftop solar and receive the same net metering benefits as under the Solar*Rewards incentive program through a request for general interconnection. Customers who wish to install solar systems outside the Solar*Rewards incentive program keep the renewable energy credits (RECs) associated with their solar production.

We have developed a standard process for electric customers who wish to install solar and receive a net meter but not participate in the Solar*Rewards program.

Questions

Customers installing distributed generation (DG), particularly Solar PV, may have questions related to the following and may submit questions to SolarProgramMN@xcelenergy.com.

•    Types of  (DG) that qualify for net metering (renewables and high efficiency CHP)
•    System sizes that qualify for net metering (less than 1 MW AC)
•    Cogeneration payment rates and optional banking of excess generation
•    Solar PV demand credit (qualifications and calculations)

Application Submission

Complete Salesforce application here.

Engineering Review

Once the study fee has been received and all other documents and steps outlined in the application documents have been met, the application will be sent for engineering review. You will receive an email to inform you that the application has been sent for engineering review.

•    Our team of engineers will review the application within 15 business days of receiving all required plan documents and the required interconnection study fee. If changes are necessary, an email will be sent to the installer requesting specific changes be made to the site plan, line diagram, and/or application details.

•    We strongly encourage a resubmitted application be returned to Xcel Energy within 10 business days from the engineer(s) initial rejection date.

Final Documentation

•    When the project receives approval from engineering, you will receive an email notification confirming that the system has been approved.

•    The installer is responsible for obtaining signatures and ensuring forms are complete before submission. Meters will not be ordered unless all above criteria outlined in the application forms have been met.

Meter Order and Installation

When the signed and dated final documents and inspection have been received, Xcel Energy will order the net meter and inform the installer that they may make an appointment with the metering department to complete the witness test with the meter technician at the time of metering installation.

Once the meters have been installed, billing will set up the customer on net energy billing and the process is complete.

Energy Saving Tip

Make sure to regularly change the air filters on your HVAC system (at least once per month). Old, clogged filters are far less efficient than new ones.

contact_GRAY@2x.png

Electrical Appliance Safety

Always keep appliances clean, operating properly, and clear of obstructions. Unplug them when cleaning or repairing to avoid serious injury.

Xcel Energy MaritzCX

We'd welcome your feedback!

Thank you for visiting Xcel Energy. You have been selected to participate in a brief customer satisfaction survey to let us know how we can improve your experience.

The survey is designed to measure your entire experience, so please look for it at the conclusion of your visit

This survey is conducted by an independent company MaritzCX, on behalf of the site you are visiting.

Privacy Policy