Interconnection Guidelines For Parallel Operation of Distribution Connected Customer-Owned Generation

Interconnection Guidelines For Parallel Operation of Distribution Connected Customer-Owned Generation

Effective date: January 2001

This document applies to Xcel Energy territories in Michigan, North Dakota, South Dakota and Wisconsin.

(Webmaster note: The size of this document requires breaking it into more manageable chunks to create HTML pages. The table shows the sections linked from the bottom of the page and the contents of each section.)

Table of Contents

I. Introduction

 A. Objectives

 B. Authority

II. General Policy

 A. Protective Devices

 B. Responsibility and Approval

 C. Financial Obligation Associated with Parallel Interconnection

 D. Compliance with Interconnection Requirements

 E. Study Requirements

 F. Self Generators

III. Interconnection Process

 A. The general process

 B. How Generation will be Used

 C. Preliminary Application

 D. Feasibility study and payment

 E. Decision To Continue

 F. Final Application

 G. Facilities Study Contract & Construction

 H. Other Agreements

 I. MAPP TPSC and DRS Study and Approvals

 J. Upon approval of the Statement of Work Agreement For the Facilities Study and Project Construction

 K. Obtaining MAPP Accreditation

IV. Interconnection Technical Requirements

 A. General Requirements (do not apply to Closed Transition units)

 B. Operating Limits

 C. Isolation Power Transformer

 D. Energization of Xcel Energy Equipment by the Customer

 E. Synchronization of Customer Generation

 F. Disconnect

 G. Protective Relays

 H. Metering

 I. Telemetry

 J. Automatic Generator Control (Generators 25 MVA and Larger)

 K. Special Interconnection Requirements associated with Secondary

V. Classification of Installations With Customer Generation

VI. Protective Devices for the Interconnection

 A. Protective relays

 B. Protection Function Requirements

 C. Circuit Breakers

 D. Single-Phase Devices - Fuses/Oil Circuit Reclosers

 E. Automatic Reclosing/Voltage Check Schemes

 F. Communication Channel

 G. Customer Owned Interconnection Protective Devices

 H. Communication with Xcel Energy Operations

VII. Pre-parallel Requirements and Inspection

VIII. Operating Guidelines

IX. Glossary

X. References

Appendices

Appendix A: Electric Agreements Requirements for Generation Connections

  • Agreements Required for Generators Connected Directly to Xcel Energy’s System
  • Agreements Which May Apply
  • Other Study Agreements
  • Summary

Appendix B: Metering and Telemetry Requirements

 A. Metering Accuracy, Testing, and Repair

 B. Metering and Telemetry Function Requirements

 C. Energy Losses

 D. Meter Reading

 E. Energy Scheduling

 F. Billing and Reporting Energy Purchased by Xcel Energy

Application forms

Please be sure to review the full document through the links at the bottom of the page before filling out an application. 

Preliminary Application for Operation of Customer-Owned Generation

PDF format (3 pages, 57K)

Microsoft Word 6.0/95 format (3 pages, 14K)

Final Application for Parallel Operation of Customer-Owned Generation

PDF format (5 pages, 86K)

Microsoft Word 6.0/95 format (5 pages, 25K)

Acknowledgements

The Xcel Energy Delivery System Planning Department compiled this document with input from many others.

Xcel Energy gratefully acknowledges permission granted by Georgia Power Company to utilize their "Guide for Interconnection Requirements and Parallel Operation of Customer Owned Generation" as a basis for several sections.

Special thanks to the project team for contributing expertise while having the patience and understanding to learn from others.

 