Comanche to Daniels Park 345-kilovolt Transmission Line — Proposed

We filed for a Certificate of Public Convenience and Necessity (CPCN) with the Colorado Public Utilities Commission for this project on February 16, 2005. The proposed line will link a new 750-megawatt, coal-fired generating unit at Comanche Station near Pueblo, Colorado, to the Daniels Park substation, south of Denver. It will be approximately 125 miles and will consist of both new transmission and re-built existing transmission.

The project involves the following proposals:

  • From Comanche Station to Midway Substation, located between Pueblo and Colorado Springs, we are proposing to acquire new right-of-way and build a new double-circuit 345-kilovolt transmission line. This double-circuit facility will not tie into the Midway Substation but will connect with the transmission lines that are currently under construction (and will be in-service by mid-April 2005) on the eastern side of the transmission corridor between Midway Substation and Daniels Park Substation (south of Denver).
  • From Midway Substation to Daniels Park Substation, we are proposing to rebuild the western existing single-circuit 230-kilovolt facility to a double-circuit facility capable of operating at 345 kilovolts within existing right-of-way. Initially these western circuits will operate at 230 kilovolts.
  • Existing switchyards at Comanche Station, Midway Substation, and Daniels Park Substation will need to be modified and upgraded. Autotransformers will be added at the Comanche Substation and the Daniels Park Substation so that these circuits will operate at 345 kilovolts when the new generating unit goes into service. This means that the surrounding fence lines at the sites will be expanded to accommodate the additional equipment.

Status

Public Open Houses were held May 2 and May 4, 2006 to provide information to, and receive input from the public on the southern portion of the Comanche to Daniels Park 345kV Transmission Line Project, between a point near the Midway Substation, south of the City of Fountain, to the Comanche 3 Generating Unit in Pueblo. The handouts at the Public Open Houses are available below and at the bottom of this page.

Project Overview (896K PDF)

Purpose and Need (95K PDF)

Siting and Permitting (778K PDF)

Public Involvement Process (135K PDF)

Environment (390K PDF)

Land Rights (218K PDF)

Engineering (108K PDF)

Comment Form (45K PDF)

Invitations were mailed to landowners within one mile of the centerline of each alternative corridor. The Public Open Houses were also posted in the local papers. The southern portion of the Project requires new right-of-way. For this reason, alternatives are being evaluated. Please provide your input on the comment form above and send it to Keary Hallack by May 12, 2006. For additional information, please contact Keary Hallack at: 800-621-9427 or 303-571-7633 or at keary.s.hallack@xcelenergy.com.

Documents

Files below are coded according to when they were filed or made available.

y

Public Open Houses were held May 2 and May 4, 2006; see details above under Status. These are the handouts that were available at the Public Open Houses; they are also available above.

z

Initial filing: February 16, 2005

y01 Handout - Project Overview (896K PDF)

y02 Handout - Purpose and Need (95K PDF)

y03 Handout - Siting and Permitting (778K PDF)

y04 Handout - Public Involvement Process (135K PDF)

y05 Handout - Environment (390K PDF)

y06 Handout - Land Rights (218K PDF)

y07 Handout - Engineering (108K PDF)

y08 Handout - Comment Form (45K PDF)

z01 Applications and exhibits (580K PDF)

z02 Johnson testimony (164K PDF)

z03 Johnson testimony-Exhibit 1 (423K PDF)

z04 Johnson testimony-Exhibit 2 (469K PDF)

z05 Johnson testimony-Exhibit 3 (405K PDF)

z06 Johnson testimony-Exhibit 4a (83K PDF)

z07 Johnson testimony-Exhibit 4b (109K PDF)

z08 Johnson testimony-Exhibit 4c (678K PDF)

z09 Johnson testimony-Exhibit 4d (776K PDF)

z10 Johnson testimony-Exhibit 4e (950K PDF)

z11 Johnson testimony-Exhibit 4f (63K PDF)

z12 Johnson testimony-Exhibit 4g (588K PDF)

z13 Johnson testimony-Exhibit 5 (308K PDF)

z14 Johnson testimony-Exhibit 6 (10K PDF)

z15 Green testimony (113K PDF)

z16 Green testimony-Exhibit 1 (606K PDF)

z17 Thompson testimony (79K PDF)

z18 Schaller testimony (175K PDF)

z19 Schaller testimony Exhibits 1-4 (1.3 MB PDF)

 